Поделиться:
Месяц | Минимальная цена | Макс. стоимость |
---|---|---|
Sep-19-2025 | 11662.30 $* | 12245.60 $* |
Aug-19-2025 | 11564.98 $* | 12142.18 $* |
Jul-19-2025 | 9702.8 $* | 10187.27 $* |
Jun-19-2025 | 11368.16 $* | 11936.97 $* |
May-19-2025 | 9898.4 $* | 10393.33 $* |
Apr-19-2025 | 11172.63 $* | 11731.65 $* |
Mar-19-2025 | 11074.51 $* | 11628.56 $* |
Feb-19-2025 | 10976.28 $* | 11525.94 $* |
Jan-19-2025 | 10878.97 $* | 11422.38 $* |
Description | | Unit | Parameter value | |
Engine | Model | | QSK19 | |
| Rated Power/Speed | kw/rpm | 503/1800 | |
| Max. Torque/Speed | Nm/rpm | 2275/1500 | |
Drivetrain | Transmission | | AC drive system, with steeples speed regulation | |
| Speed range | | | |
Standard Tire of Break System | | | Fully hydraulic controlled dry disc brake | |
Hoist system | Hoist Time | s | 16 | |
| Hoist Angle | 。 | 68 | |
Cab | | | FOPS cab | |
Tires | | | 875/65R29 | |
Electrical System | | V | 24 |
1: What kind terms of payment can be accepted? A: For terms of payment, L/C, T/T, D/A, D/P, Western Union (can be) could accepted | | | | | ||||
2: What certificates are available in Machinery? A: For the certificate, we have CE, ISO, Gost, EPA(USA)CCC, | | | | | ||||
3: What about the delivery time? A: 7-20 days after receiving the deposit. | | | | | ||||
4: What about the warranty time? A: 12 months after shipment or 2000 working hours, whichever occuts first. | | | | | ||||
5. What about the Minimum Order Quantity? A: The MOQ is 1 pcs | | | | |
Данные ресурс не является интернет-магазином, а лишь содержит ссылки на международную торговую площадку Alibaba.com