Поделиться:
Месяц | Минимальная цена | Макс. стоимость |
---|---|---|
Sep-17-2025 | 0.94 $* | 0.5 $* |
Aug-17-2025 | 0.85 $* | 0.89 $* |
Jul-17-2025 | 0.22 $* | 0.60 $* |
Jun-17-2025 | 0.44 $* | 0.82 $* |
May-17-2025 | 0.24 $* | 0.77 $* |
Apr-17-2025 | 0.13 $* | 0.65 $* |
Mar-17-2025 | 0.4 $* | 0.71 $* |
Feb-17-2025 | 0.39 $* | 0.5 $* |
Jan-17-2025 | 0.61 $* | 0.24 $* |
Measurement mode | MEAS | pH/mV |
CAL | pH calibration | |
SET | End point setting | |
MET | monotonic titration | |
Burette | Volume | 15mL/25mL |
Stirring | Mode | magnetic |
Titration cup volume | 100mL | |
Electrode | mv/pH | 1 × BNC |
Reference | 1 | |
PT1000 | 1 × NTC | |
Communication | USB | 1 |
Stirrer | 1 | |
Power | 1 | |
Printer | 1 |
Technical Date: | ||
mV/pH | Measurement range | ±1,999 mV 0.00~14.00 pH |
Resolution: | 0.1 mV / 0.01 pH | |
Error | 0.2 mV / 0.02pH | |
PT1000 | Measurement range | 0-100℃ |
Resolution: | 0.1 ℃ | |
Error | 0.2 ℃ | |
Burette | 15 mL tolerance | ±0.025mL |
25 mL tolerance | ±0.035mL | |
Dosing Repeatability | 0.20% | |
mV Repeatability | ≤0.2mV | |
Controller | Display | 7'' inch touch screen |
Information | Weight | 10 Kg |
Power | 110-240V,50/60 Hz |
Q: How about quality of the goods?
A:l All the running products comply with CE standards.
l Independent quality inspection team, conducting multiple inspections and random inspections from parts supply to product dispatch.
l Well-known third-party testing service available, such as SGS, BV, and TUV, etc.
Q: What are your pre- and after-sales services?
A:l Timely reply to pre-sales enquiries
l Real-time update of manufacturing and shipment status
l Contracted third-party maintenance company in over 60 countries
Assured availability of parts supply for 10 years at least
Q: Is OEM service available.
A: Most of the running products are available for OEM customization, including logo, package and function, if attainable, customization.
Q: How long is the lead time:
A: Generally, the lead time for most stocked products is about 7~15 days, vary by models and production schedule. For those non-stocked products, the manufacturing lead time is around 20 days.
Данные ресурс не является интернет-магазином, а лишь содержит ссылки на международную торговую площадку Alibaba.com