Газовая электростанция электричество 500 кВт-1500 кВт Газовый генератор газовая


Поделиться:


Цена:*

Количество:



Описание и отзывы


Трекер стоимости

Месяц Минимальная цена Макс. стоимость
Sep-17-2025 0.32 $* 0.82 $*
Aug-17-2025 0.26 $* 0.82 $*
Jul-17-2025 0.32 $* 0.67 $*
Jun-17-2025 0.24 $* 0.54 $*
May-17-2025 0.27 $* 0.74 $*
Apr-17-2025 0.20 $* 0.37 $*
Mar-17-2025 0.51 $* 0.61 $*
Feb-17-2025 0.31 $* 0.76 $*
Jan-17-2025 0.72 $* 0.92 $*

Характеристики



Gas power plant electricity 500kw - 1500kw gas generator gas turbine


Application field




Gas type:
Natural gas, biogas, biomass gas, coal-bed methane gas, coal gas, oilfield associated gas, etc.
Apply:Over 41% efficiency gas power plant 1MW - 2MW gas power generation


Specifications


Generator Model
RH1200
RH1600
RH2000
Prime Power
1100kw
1500kw
2000kw
Alternator brand
Leroy Somer
Leroy Somer
Leroy Somer
Voltage and frequency
110v- 11000v 50/60HZ
110v- 11000v 50/60HZ
110v- 11000v 50/60HZ
Generator efficiency
41%
41.3%
41.5%
KW.H/M3 natural gas
4.09-4.58kw
4.12-4.61kw
4.14-4.63kw
Engine model
12V170
16V170
20V170
Rotating Speed 
1500rpm
1500rpm
1500rpm
Bore/Stroke
170/195mm
170/195mm
170/195mm
Displacement
53.1L
70.8L
88.5L
Average piston speed
9.75 m/S
9.75 m/S
9.75 m/S
Generator Dimension
5300*1700*2300mm
6820*1700*2615mm
7320*1700*2615mm
Generator Net weight
13000kg
15000kg
17000kg
Lubricant oil average consumption
0.3g/kwh
0.3g/kwh
0.3g/kwh


Why choose us




1.High Efficiency:The power generation efficiency is more than 41%, and the comprehensive utilization efficiency is more than 86%.
2.Low Emission: Nox ≤500mg/ Nm³(2g/kWh) Nox ≤ 500mg / Nm³ (2g / kWh).
3.High Reliability: The overhaul period of the unit is 48000 hours, and the annual operation hours are as high as 8000 hours.
4.Low Lubricating Oil Consumption: ≤0.3g/kWh Lubricating oil consumption ≤0.3g/kWh.
5.Easy Maintenance: Professional maintenance personnel, sufficient spare parts warehouse, and complete service system.
6.High Safety: The multi-level fire-retardant and explosion-proof design and advanced detonation control technology are employed.
7.Compact Structure: Small size, light weight and power per liter ranked No. 1 in China for the same type of units.
8.Wide Range Of Applications: It is used in natural gas, biogas, gas, biomass gas, landfill gas, industrial gas and other gas power generation fields.








Successful case


1. Rongcheng Garden Hotel Distributed Energy Station Project
The project is located in the basement of Rongcheng Garden Hotel,
Xiangfu Road,Changsha.using 3 sets1.1MW natural gas-fired internal combustion generator sets.
After the project is put into operation, the annual power generation capacity is
4.224 million kW, and the annual standard coal can be saved by 1348.6 tons.
The comprehensive utilization rate can reach 70%-85%.


2.Changsha Huanghua International Airport T2 Terminal Project
This project is located in Changsha City, Hunan Province, using 1.1mw
natural gas generator.


3.Chengdu Biomass Gas Generation Project
The project is located in Chengdu, with a installed capacity of LY800GH-S biomass gas
generator set. It uses tar-free biomass gas fuel. When the low heat value is
1200kcal/m3, the unit power is 800 kW.


4.Changde Jinshi biogas project
Provided 2 x 1.1MW biogas generator sets forChangde Jinshi Biogas Project, and the
project is under construction.


Xiaohuigou Coal Mine Low Concentration Gas Power Generation Project
The project is located in Xiaohuigou Coal Mine, Mayutown, Qingxu County, Shanxi Province.
The construction scale is 10MW, and the annual power generation is expected to be
7200×104kW•h. Provides 10×1MW low-concentration gas engine.


Certificate ,visitors & shipment






Spare parts


Ship out within 5 working days after receiving request.




Recommend Products




FAQ


Q1. How to find suitable generator?
A:Tell me how many kw you need, and gas type, voltage and frequency, then right model will be recommend.

Q2. What is your transport?
A: Generator set recommend ship by sea or by cargo on land.

Q3. What is your terms of payment?
A: 30% TT in advance as deposit, and 70% balance paid before delivery.

Q4. What is your terms of price?
A: EXW, FOB, CIF, CFR.

Q5. How about your delivery time?
A: Normally 25 days - 50 days after we receive advance payment. Depends on order size and generator model.

Q6. Do you test all your goods before delivery?
A: Yes, we have 100% test before delivery. Inspect by third party also acceptable.

You are highly welcomed to ask questions and leave message.
Tel:/Wechat:/What's up:0086 15966309493


Данные ресурс не является интернет-магазином, а лишь содержит ссылки на международную торговую площадку Alibaba.com