Акция различные Литые детали высокопроизводительная ударная Дробилка


Поделиться:


Цена:*

Количество:



Описание и отзывы


Трекер стоимости

Месяц Минимальная цена Макс. стоимость
Sep-19-2025 0.51 $* 0.13 $*
Aug-19-2025 0.98 $* 0.24 $*
Jul-19-2025 0.34 $* 0.17 $*
Jun-19-2025 0.88 $* 0.16 $*
May-19-2025 0.1 $* 0.65 $*
Apr-19-2025 0.64 $* 0.86 $*
Mar-19-2025 0.71 $* 0.65 $*
Feb-19-2025 0.45 $* 0.3 $*
Jan-19-2025 0.62 $* 0.61 $*

Характеристики



Product Description








Equipment Advantages


Performance Features
1.The optimized design of the deep cavity rotor increases the cavity volume and improves the throughput substantially.
2.Diversified crushing cavity. The "stone hitting stone" crushing chamber is suitable for crushing all materials, especially highly abrasive materials, with low cost of wearing parts and high quality of output. The "stone hitting iron" crushing chamber is suitable for crushing medium and below abrasive materials, and its crushing efficiency is high.
3.The feeding inlet is equipped with feeding adjustment device, which can control the ratio of central feeding and waterfall feeding. The waterfall feeding technology can not only improve the energy utilization rate and increase the output, but also adjust the product shape and control the powder content. The product is of high quality, cubic in shape, with low flake content, which is especially suitable for aggregate shaping and artificial sand making.
4.The oil station can better meet the crushing needs of various materials with different characteristics, with sufficient lubrication and forced heat dissipation while having multiple safety protection such as oil leakage, less oil and overheating, etc. The special sealing structure ensures no oil leakage even without oil seal.
5.Adopt imported bearings (NSK, FAG, etc.), and configure soft start cabinet to monitor motor and lubrication station, with all-round overload display and protection function.



Product Recommendation




Production Process




Exhibition




Company View




Packing&Transportation




FAQ




1. How long is the construction period?
As appropriate, about 15 to 60 days.
2. What are the components of wear-resisting parts?
Mn13Cr2, Mn18Cr5, Alloy.
3. How long is wear-resisting parts quality guarantee period?
As appropriate, about 200-6000 working hours.
4. How to install?
Customers shall install by themselves and we provide installation instructions.


Данные ресурс не является интернет-магазином, а лишь содержит ссылки на международную торговую площадку Alibaba.com