Поделиться:
Месяц | Минимальная цена | Макс. стоимость |
---|---|---|
Aug-17-2025 | 118.60 $* | 120.26 $* |
Jul-17-2025 | 96.47 $* | 98.58 $* |
Jun-17-2025 | 116.81 $* | 118.3 $* |
May-17-2025 | 115.22 $* | 117.30 $* |
Apr-17-2025 | 92.32 $* | 94.93 $* |
Mar-17-2025 | 113.73 $* | 115.56 $* |
Feb-17-2025 | 113.14 $* | 115.49 $* |
Jan-17-2025 | 112.64 $* | 114.18 $* |
· Overall Dimensions 19.36' x 7' x 3.5" (5900mm x 2130mm x 88mm)
· Surface Dimensions: 19.36' x 7' (12m2)
· Weight: 1,345 lbs. (610 kgs)
Oil Rig Temporary Construction Road Ground Protection Mats Advantages:
Solid ground support in all soils
Provide safe work platform for personnel
Reduce site construction cost
Reduce site reclamation cost
Reduce transportation cost
Reduce liner cost
Reduce liner disposal cost
Protect site from spills
Oil Rig Temporary Construction Road Ground Protection Mats Applications
· Temporary road and haul routes
· Stable jobsite platform and staging areas
· Ground protection in sensitive environments
· Liner protection and spill reduction for oil & gas drill sites
Pattern of Oil Rig Temporary Construction Road Ground Protection Mats
Connector System of Oil Rig Temporary Construction Road Ground Protection Mats
Loading Weight of Oil Rig Temporary Construction Road Ground Protection Mats
Size | Thickness | Weight | Loading Weight |
915x2440mm | 12.7mm | 31.25KGS | 50 Tonnes |
1220x1830mm | 15mm | 36.39KGS | 60 Tonnes |
1220x2440mm | 20mm | 63.40KGS | 80 tonnes |
1000x3000mm | 25mm | 78.90KGS | 100 tonnes |
2000x5900mm | 30mm | 369.4KGS | 120 tonnes |
5900x2130mm | 88mm | 610kgs | 300 tonnes |
Advantages of Oil Rig Temporary Construction Road Ground Protection Mats
1.Solid one piece construction
2.Unique surface
3.Lower transport cost than other mats
4.Tough durable working areas and temporary roads for heavy plant, equipment and multiple vehicle
5.Protect against severe rutting and eco damage to ground and sensitive sites
6.Support health & safety objectives
7.A reversible low profile surface for drilling rigs, work pads, depot areas and helipads
8.Connection options for different terrain & equipment
9.Non-conductive - ideal for use on transmission projects
10.Designs and manufactured in China
F. Application of Oil Rig Temporary Construction Road Ground Protection Mats
a.Construction, civil engineering and groundwork
b.Pedestrian walkways
c.Emergency access routes
d.Temporary roadways and car parks
e.Utilities and infrastructure maintenance
f.Landscaping and protection of heritage or eco-sensitive areas
g.Golf course and sport field maintenance
h.Sports and leisure events
i. Beach access for wheelchair
j. Helicopter landing
G. Test of Oil Rig Temporary Construction Road Ground Protection Mats
I. Guarantee of Oil Rig Temporary Construction Road Ground Protection Mats
Hereby Xinxing gurantee that all the Xinxing GROUND MATS, Temporary road mat, construction truck mat, heavy duty access mat etc. can be used normally more than 5 years with no break, if there is any break caused by our material within 2 years, Xinxing will freely replace it.
J. Maintenance of Oil Rig Temporary Construction Road Ground Protection Mats
I. Cleaning
No specialist equipment is required to clean the X ground mats, they can easily be cleaned using a pressure washer and cold water. If heavily soiled the excess mud should be brushed off before being pressure washed
II. Store
Temporary road mat, construction truck mat, heavy duty access mat etc. need to place in a flat ground or pallet
K. Case Study of Oil Rig Temporary Construction Road Ground Protection Mats
The largest factory in China about Temporary Ground Protection Mat, Heavy Duty Temporary Black Plastic Road Mat, HDPE Access Mat, Construction Road Mat, Temporary Ground Mat, 8 workshops, 12 sets CNC machines, all kinds of certification and industry standards could be met. In addition, we could provide the best after-sale service, 24 hours online for you!
Our Abosn company:
Q: Are you trading company or manufacturer ?
A: We are factory.
Q: How long is your delivery time?
A: Generally it is 5-10 days if the goods are in stock. or it is 15-20 days if the goods are not in stock, it is according to quantity.
Q: Do you provide samples ? Is it free or extra ?
A: Yes, we could offer the sample for free charge but do not pay the cost of freight.
Q: What is your terms of payment ?
A: Payment<=1000USD, 100% in advance. Payment>=1000USD, 30% T/T in advance, balance before shippment.
120 Tonnes Unbreakable Heavy Duty Construction Road Mat
Oil Rig Temporary Construction Road Ground Protection Mats
Данные ресурс не является интернет-магазином, а лишь содержит ссылки на международную торговую площадку Alibaba.com