Поделиться:
Месяц | Минимальная цена | Макс. стоимость |
---|---|---|
Sep-17-2025 | 0.83 $* | 0.3 $* |
Aug-17-2025 | 0.23 $* | 0.69 $* |
Jul-17-2025 | 0.17 $* | 0.37 $* |
Jun-17-2025 | 0.92 $* | 0.84 $* |
May-17-2025 | 0.23 $* | 0.73 $* |
Apr-17-2025 | 0.58 $* | 0.30 $* |
Mar-17-2025 | 0.41 $* | 0.80 $* |
Feb-17-2025 | 0.2 $* | 0.31 $* |
Jan-17-2025 | 0.26 $* | 0.60 $* |
Basic Data | ||
Engine type | 1HZ | |
Fuel type | Diesel | |
Displacement (ml) | 4164 | |
Emission standard | Euro VI | |
Driving mode | 4*4 | |
Curb weight (kg) | 1700 | |
GVW (kg) | 2910 | |
Wheelbase (mm) | 2980 | |
The dimensions of the Vehicle (mm) | 5070*1770*2115 | |
Max power(Kw/rpm) | 96/3800 | |
The maximum torque Nm/rpm | 360N.m | |
Suspended system | Front: Coil Rear: Drum | |
Transmission | 5-Speed MT | |
Top Speed(km/h) | 120 | |
Seat | 2 |
Medical compartment device | ||||
1. | Installation of partition wall and two sliding windows. | 1 | ||
2. | Installation of composite Walker fire-retardant board equipment cabinet. | 1 | ||
3. | Installation of a doctor folding seat in the middle partition. | 1 | ||
4. | Installation of all-round safety handrail on the middle door. | 1 | ||
5. | Installation of 3-seat long bench with safety belt on the right side. | 1 | ||
6. | Installation of an 8-transparent sliding storage lockers are on the top of the left side of the medical compartment. | 1 | ||
7. | Installation of long rows of medical equipment cabinets are under the left side of the medical compartment. | 1 | ||
8. | Installation of fixed rod of infusion pump is on the left side of medical compartment. | 1 | ||
9. | Installation of oxygen socket (for ventilator and humidifier). | 1 | ||
10. | Installation of oxygen fixing cabinet at the left rear. | 1 | ||
11. | Installation of two ways ventilation fan on the top. | 1 | ||
12. | Installation of transfusion hanger on top of medical cabin | 1 | ||
13. | Installation of 10L oxygen cylinder (with reducer). | 1 | ||
14. | The medical cabin is equipped with a complete closed oxygen supply system | 1 | ||
15. | Installation of humidifier. | 1 | ||
16. | 1kg fire extinguisher. | 1 | ||
17. | Installation of environment friendly waterproof, antiskid, anti-static and anti-corrosion floor (with coating). | 2 | ||
18. | Installation of full set of anti-collision soft bag. | 1 | ||
19. | Installation of automatic loading stretcher and platform. | 1 | ||
20. | Installation of thermal insulation, sound insulation and thermal insulation layer. | 1 | ||
21. | The exterior decoration can be pasted according to the customer's requirements | 1 |
Данные ресурс не является интернет-магазином, а лишь содержит ссылки на международную торговую площадку Alibaba.com