Поделиться:
Месяц | Минимальная цена | Макс. стоимость |
---|---|---|
Sep-17-2025 | 5.36 $* | 5.10 $* |
Aug-17-2025 | 5.56 $* | 5.98 $* |
Jul-17-2025 | 4.40 $* | 4.25 $* |
Jun-17-2025 | 5.11 $* | 5.73 $* |
May-17-2025 | 4.50 $* | 4.11 $* |
Apr-17-2025 | 5.40 $* | 5.40 $* |
Mar-17-2025 | 5.12 $* | 5.58 $* |
Feb-17-2025 | 4.58 $* | 4.41 $* |
Jan-17-2025 | 4.46 $* | 4.83 $* |
Please Attention :
Guoyao Factory offer you :
1. Factory direct price
2. Nice Quality
3. Quick shipping within 15 days
4. Small order will be welcome
5. Online payment
6. Support 7 days refund
7. After sales service 24 / 7
Aluminuim Snap Frame are a very popular advertising poster frame, are a very popular advertising poster frame a1 a2 a3 a4 , because they are so economical and easy to use. Effective way to display any advertising poster. You simply clip open the frame of the poster holder, place your poster inside and snap it closed again in just seconds. This simple mechanism, combined with their low cost, has made them the most popular form o retail poster display on the market today.
Material | 100% aluminium profile alloy |
Size | A0/A1/A2/A3/A4/Custom Size |
Capability | 100 Tons / month |
MOQ | 500pcs |
Type | Double-sided Poster Frame |
Color | Customized Color |
From the raw material to the finish product quality is always our first consideration. We do not use wste aluminum to make production , all using 99.9% aluminum ingots .
Q5: How do you charge the tooling charge?
A: In case we need to open new tooling for your ordered profiles, the tooling charge will be refunded to you when your order quantity reaches a certain amount.
Q6: What is the difference between theoretical weight and actual weight?
A: Actual weight is the actual weight including packaging. Theoretical weight is identified according to the drawing, calculated by of the weight of each meter multiplied by the length of profile.
Q7: How do you quote price, per ton or per meter?
A: We provide more than two pricing modes.
Q8: How can you ensure high quality?
A: 1) We have our own material production workshop and tooling factory for 10 years.
2) 300 experienced workers, and all these workers are well trained when start work.
3) 100% QC on line and final inspection, no any defective products can be out from our factory.
4) We have a lot of certificates to ensure our quality, such as ISO9001:2015 and CE certificate .
Q9: What's delivery time for sample and mass production?
A: (1) Tooling developing and sample testing: 12-18 days .
(2) Mass production completed: 20-30 days after sample is confirmed by buyer.
Данные ресурс не является интернет-магазином, а лишь содержит ссылки на международную торговую площадку Alibaba.com