Поделиться:
Месяц | Минимальная цена | Макс. стоимость |
---|---|---|
Sep-17-2025 | 0.93 $* | 0.22 $* |
Aug-17-2025 | 0.11 $* | 0.38 $* |
Jul-17-2025 | 0.53 $* | 0.58 $* |
Jun-17-2025 | 0.11 $* | 0.97 $* |
May-17-2025 | 0.1 $* | 0.41 $* |
Apr-17-2025 | 0.57 $* | 0.54 $* |
Mar-17-2025 | 0.55 $* | 0.33 $* |
Feb-17-2025 | 0.75 $* | 0.64 $* |
Jan-17-2025 | 0.35 $* | 0.47 $* |
ELECTRICAL PARAMETERS | ||||||||||||
Type | JAM72S30-525/MR | JAM72S30-530/MR | JAM72S30-535/MR | JAM72S30-540/MR | JAM72S30-545/MR | JAM72S30-550/MR | ||||||
STC NOCT | STC NOCT | STC NOCT | STC NOCT | STC NOCT | STC NOCT | |||||||
Rated Maximum Power(Pmax) [W] | 525 397 | 530 401 | 535 405 | 540 408 | 545 412 | 550 416 | ||||||
Open Circuit Voltage(Voc) [V] | 49.15 46.05 | 49.30 46.18 | 49.45 46.31 | 49.60 46.43 | 49.75 46.55 | 49.90 46.88 | ||||||
Maximum Power Voltage(Vmp) [V] | 41.15 38.36 | 41.31 38.57 | 41.47 38.78 | 41.64 38.99 | 41.8 39.20 | 41.96 39.43 | ||||||
Short Circuit Current(lsc) [A] | 13.65 10.97 | 13.72 11.01 | 13.79 11.05 | 13.86 11.09 | 13.93 11.13 | 14.00 11.17 | ||||||
Maximum Power Current(lmp) (A] | 12.76 10.35 | 12.83 10.39 | 12.90 10.43 | 12.97 10.47 | 13.04 10.51 | 13.11 10.55 | ||||||
Module Efficiency [%] | 20.3% | 20.5% | 20.7% | 20.9% | 21.1% | 21.3% | ||||||
Power Tolerance 0~+5W | ||||||||||||
Temperature Coefficient of Isc(α_jsc) +0.045%/°C | ||||||||||||
Temperature Coefficient of Voc(β_Voc) -0.275%/°C | ||||||||||||
Temperature Coefficient of Pmax(γ_Pmp) -0.350%/°C | ||||||||||||
STC(Standard Testing Conditions):Irradiance 1000W/㎡,Cell Temperature 25℃.Spectra at AM1.5 NOCT(Nominal Operating Cell Temperature):Irradiance 800W/㎡,Ambient Temperature 20℃, Spectra at AM1.5 Wind at 1m/s |
OPERATING CONDITION | ||
Maximum System Voltage | 1000V/1500V DC(IEC) | |
Operating Temperature | •40°C~+85°C | |
Maximum Series Fuse | 25A | |
Maximum Static Load,Front | 5400Pa | |
Maximum Static Load,Back | 2400Pa | |
NOCT | 45±2°C | |
Safety Class | Glass Ⅱ | |
Fire Performance | UL Type 1 |
T/T | EXW | 30%T/T in advance,paid the balance before shipment | |||||
FOB | |||||||
CFR(C&F) | 30%T/T in advance,paid the balance against copy of B/L | ||||||
CIF | |||||||
L/C | Optional L/C amount above 50,000usd, we can accept L/C at sight | ||||||
West Union | |||||||
paypal | |||||||
Delivery Time | 7~10days after receiving payment for one container |
Данные ресурс не является интернет-магазином, а лишь содержит ссылки на международную торговую площадку Alibaba.com