Пластиковые строительные леса пластиковые мусор


Поделиться:


Цена:*

Количество:



Описание и отзывы


Трекер стоимости

Месяц Минимальная цена Макс. стоимость
Sep-17-2025 0.22 $* 0.96 $*
Aug-17-2025 0.48 $* 0.7 $*
Jul-17-2025 0.68 $* 0.25 $*
Jun-17-2025 0.38 $* 0.57 $*
May-17-2025 0.81 $* 0.41 $*
Apr-17-2025 0.15 $* 0.41 $*
Mar-17-2025 0.73 $* 0.61 $*
Feb-17-2025 0.43 $* 0.36 $*
Jan-17-2025 0.53 $* 0.98 $*

Характеристики





Product Description


A rubble chute is used to enable the safe and efficient transfer of debris/materials from a structure's scaffold to a skip at street level. The simple concept is that several cylindrical dustbin-like sections are linked together using chains and hung from the side of a building or scaffold.




CHUTE
HOPPER






Connecting the side entry hopper to multiple chutes
The side hopper is designed to sit 100mm inside a 500mm diameter rubbish chute. Meaning it has a working length of 1100mm when assembled.
It is recommended that for every 10 metres of chutes, an extra fixing frame is required to ensure safety.

For example if you were working at the following heights;
* 10 metres = x9 chutes + x1 side hopper + x1 top hopper + x1 fixing bracket
* 20 metres = x19 chutes + x1 side hopper + x1 top hopper + x2 fixing brackets

When connected together they become a flexible unit which provides a versatile chute system.
All side entry hoppers are produced to the highest quality for complete safety in accordance with the ISO 9001 quality system, using only prime plastic.


Specification




Packing & Delivery




FAQ


1. Q: What's your MOQ(minimum order quantity)?
A: Any quantity for the sample and stocks..

2. Q: What's your packing methods?
A: Packed into plywood box/ton bag, or as your demands.

3. Q: What's your payment terms?
A: T/T 30% in advance & T/T 70% upon sending the copy of Bill of Lading, L/C 100%, or negotiate according to the order status.

4. Q: What's your delivery time?
A: 10-20 days after received the advance payment or L/C.

5. Q: Are you manufacturer or trader?
A: We are the munafacturer of SCAFFOLDINGS MATERIALS for years, coveraged every scaffolding systems.

6. Q: Can we visit your factory?
A: Warmly welcome. Once we have your schedule, we will arrange the professional sales team to follow up your case.

7. Q: Can you supply other scaffolding materials?
A: Yes. All related scaffolding materials.
(1) scaffolding system (ring lock system, frame, pipe&coupler system)
(2) scaffolding pipes (1.5'-2.0')x(0.3-12m), hop dipped galvanized / black. BS1139, STK500
(3) steel pipes (ERW BS1387, SSAW PIPE, Sqaure/ Rectangular tube GB/T6728)
(4) steel coupler (preesed / drop forged)
(5) steel plank with / without hooks
(6) steel stair case
(7) screw adjustable base jack
(8) Adjustable props


Похожие товары

Данные ресурс не является интернет-магазином, а лишь содержит ссылки на международную торговую площадку Alibaba.com