Поделиться:
Месяц | Минимальная цена | Макс. стоимость |
---|---|---|
Aug-19-2025 | 62.67 $* | 63.9 $* |
Jul-19-2025 | 50.4 $* | 51.29 $* |
Jun-19-2025 | 61.36 $* | 62.63 $* |
May-19-2025 | 61.66 $* | 62.99 $* |
Apr-19-2025 | 49.58 $* | 50.85 $* |
Mar-19-2025 | 60.2 $* | 61.11 $* |
Feb-19-2025 | 59.53 $* | 60.82 $* |
Jan-19-2025 | 59.95 $* | 60.23 $* |
Products details
product name | Professional design auto cad prefabricated structure stainless clad fabrication steel workshop building |
material grade | Q345B / Q235B |
surface treatment | 2 coats of mid grey paintings or hot dipped galvanized as per the client’s requirements |
building size | Customer required |
roof and wall | Galvanized steel sheet metal or alum-zinc coating steel |
insulation material | Fiber glass wool insulation or EPS or PU sandwich panel |
usage | Warehouse/Workshop |
type | Pre engineering steel structure building |
Material of window & door | Alum. alloy window and sliding door or as per the customer’s requirements |
brand name | XGZ |
building life time | 50 years |
place of origin | Shandong, China |
All of our products have already been authorized through ISO9001 quality system. We have specialized quality control departments. We also have a very strict quality control system to the products. Because we want to be responsible for every product quality we sold. Our group company has set up a very good reputation for many years. We will offer the products resting assured to customer.
Why choose our prefabricated steel structure building?
1. More than 22 years' experience, our products had been exported to more than 80 countries all over the world
2. We supply R & D, engineering, fabrication, exporting, and installation with one stop shopping service.
3. With ISO9001:2015, SGS, BV and CE certification
4. Xinguangzheng group with 5 branch factories located in Qingdao, Shandong Province. Our annual production capacity: only for H welded steel: 720,000 TONS – 1,200,000 TONS per year
5. Design software: PKPM, 3D3S, X-Steel, SAP2000, AUTOCAD, T-Arch, etc
Building Options & Specifications
1. Options
1) We can supply steel structures building for workshop, warehouse, showroom, hangar, hotel apartment, shopping mall, container house, poultry house, garage, bridge crane, various steel structure materials etc.
2) We can also make and develop new parts according to customers' drawings and detailed dimensions.
2. Specifications
Items | Specification | |
Main Steel Frame | Column | Q235B, Q345B Welded H Section Steel |
Beam | Q235B, Q345B Welded H Section Steel | |
Secondary Frame | Purlin | Q235B C or Z purlin |
Knee brace | Q235B Angle Steel | |
Tie Rod | Q235B Steel Pipe | |
Brace | Q235B Round Bar | |
Vertical and Horizontal Support | Q235B Angle Steel, Round Bar or Steel Pipe | |
Maintenance system | Roof | EPS Sandwich Panel / Glass Fiber Sandwich Panel / Rock Wool Sandwich Panel / PU Sandwich Panel / Corrugated Steel Sheet |
Wall | EPS Sandwich Panel / Glass Fiber Sandwich Panel / Rock Wool Sandwich Panel / PU Sandwich Panel / Corrugated Steel Sheet / Glass curtain wall / Aluminum composite panel | |
Accessories | Window | Aluminium Alloy Window / PVC Window |
Door | Sliding Sandwich Panel Door / Roll-up Door / Lifting Door / PVC Fast Door / Entrance Door | |
Rainspout | PVC / UPVC | |
Live load on Roof | In 120 kg / Sq.m (Color steel panel surrounded) | |
Wind Resistance Grade | as per local data | |
Earthquake-resistance | as per local data | |
Structure Usage | Up to 50 years | |
Finishing | Optional | |
Paint Options | Alkyd anti-rust paint / Zinc rich epoxy paint / Hot dipped galvanized |
Advantages of steel structure building than concrete structure:
1. The total weight of the building is light: about half of the concrete structure weight, which can reduce the foundation cost
2. Fast construction: the construction period is shortened by 1/4 to 1/6 compared with the traditional concrete structure
3. Strong flexibility: large open span design, indoor space can be divided into multiple programs to meet the different needs of owners. In particular, the exhibition center can adopt the pipe truss structure, which is easy to realize the large space function, increase the space height, and has the characteristics of beauty and comfort. This structure has been mostly used in airport projects.
4. Good energy-saving effect: the wall is made of factory-made steel components, or light-weight energy-saving standardized C-shaped steel, square steel, sandwich panel, high processing precision, good thermal insulation performance, good earthquake resistance
5. Good environmental protection effect: greatly reduce the amount of sand, stone, ash, environmental protection and energy saving during construction.
I. Steel structure warehouse – Hisense Logistics Warehouse
2. Steel structure workshop – Algeria Television Workshop
3. Steel structure car showroom – Uruguay Audi car showroom
4. Steel structure super market – Angola Supermarket
5. Steel structure airport hangar – Niger Airport Hangar
6. Steel structure cold store – Uzbekistan Cold Storage
7. Steel structure stadium – Shandong Luneng Stadium
Our Factory
Our factory is a professional steel structure manufacturer in China. We are capable in taking over all types of steel structure building, which contains all step of designing, producing, installing. And our factory was founded in 1997, our products have been exported to more than 80 countries all over the world. Besides, we have strong engineering teams of 60 senior engineers. We are a group factory of 5 branch factories and we can produce all accessory materials of steel buildings by ourselves.
Our Engineering Team
Our certificates
Our service
Packing & Delivery
Normally we will use steel pallets for the main steel structures.
Delivery time: It usually needs about 30 – 45 days once we received the deposit and shop drawings approval.
Customer visiting
FAQ:
Q: Are you trading company or manufacturer ?
A: We are a big manufacturing company with 5 branch factories.
Q: How long is your delivery time?
A: Generally it is about 30 – 45 days according to our mass production schedule.
Q: Do you provide samples ? Is it free or extra charge ?
A: Yes, we could offer the sample for free charge but the freight cost should be paid by the customer.
Q: What is your terms of payment ?
A: 30% T/T in advance , the balance payment before shipment.
B: 100% irrevocable L/C payment at sight
Данные ресурс не является интернет-магазином, а лишь содержит ссылки на международную торговую площадку Alibaba.com