Поделиться:
Месяц | Минимальная цена | Макс. стоимость |
---|---|---|
Sep-17-2025 | 11900.23 $* | 12495.40 $* |
Aug-17-2025 | 11800.76 $* | 12390.30 $* |
Jul-17-2025 | 9900.24 $* | 10395.16 $* |
Jun-17-2025 | 11600.73 $* | 12180.9 $* |
May-17-2025 | 10100.70 $* | 10605.1 $* |
Apr-17-2025 | 11400.95 $* | 11970.7 $* |
Mar-17-2025 | 11300.24 $* | 11865.90 $* |
Feb-17-2025 | 11200.3 $* | 11760.49 $* |
Jan-17-2025 | 11100.26 $* | 11655.72 $* |
SHENZHEN CYCLEMAKER TECHNOLOGY CO.,LTD | ||||||||||
Product Introduction | ||||||||||
Hydraulic pressing Machine (50T) | Model:CH-10-19S | |||||||||
Description: | ||||||||||
1、It's a universal equipment which is processing tubes and plates to form different shapes by pressing, it's suitable for different processing situation. | ||||||||||
2、Easy adjustment, fast mould exchange, high efficiency and stable performance. | ||||||||||
3、It adopt hydraulic cylinder push the driving mold to rise and down, the journey switch controls the stroke; | ||||||||||
4、Simple mold size can be customized. | ||||||||||
ITEMS | VALUE | |||||||||
Function | Pressure working | |||||||||
Application | different materials and shapes | |||||||||
Hydraulic cylinder specification | Φ180×400 | |||||||||
Cavity height range | 100~500 mm | |||||||||
Plate processing range | Length ≤700×480 mm | |||||||||
Tube processing range | Length ≤700 mm | |||||||||
Capacity | 500-700PCS/HR | |||||||||
Operation mode | Semi-automatic | |||||||||
Power | 5.5 KW | |||||||||
Voltage | 3P 380V 50Hz | |||||||||
Control method | PLC | |||||||||
Start method | Double switch | |||||||||
Hydraulic working pressure | 14 MPa | |||||||||
Max. system pressure | 20 MPa | |||||||||
Color | Green | |||||||||
Size | 2200×900×2500 mm | |||||||||
Weight | 1700 KG |
Product Code | CH-10-19S Hydraulic pressing Machine (50T) |
Place of Origin | Shenzhen,China |
Brand Name | New Canghai |
Certification | ISO9001,ISO14001,CE |
MOQ | 1 SET |
Supply Ability | 100SETS/Month |
Packaging | Protective film/Pollywood Case/Container |
Shipping Port | Shenzhen Sea Port of China |
Trade Terms | FOB CFR CIF |
Lead time | 15 working days for mold. |
45 working days for machine after receiving deposit | |
Total Employees | 200 |
Payment term | 30% T/T in advance, 70%balance paid before arranging shipment.,Western Union or LC at sight |
Shipping Terms | 20'GP container ,40'GP container,40'HQ container,LCL by sea |
Данные ресурс не является интернет-магазином, а лишь содержит ссылки на международную торговую площадку Alibaba.com