Краситель 500 л микродистилляционное оборудование до сих пор самогонная дистилляционная кастрюля дистиллятор


Поделиться:


Цена:4 480,00 $ - 45 000,00 $*

Количество:



Описание и отзывы


Трекер стоимости

Месяц Минимальная цена Макс. стоимость
Sep-17-2025 5331.17 $* 5598.66 $*
Aug-17-2025 5286.10 $* 5550.92 $*
Jul-17-2025 4435.11 $* 4657.84 $*
Jun-17-2025 5197.54 $* 5457.91 $*
May-17-2025 4525.31 $* 4751.19 $*
Apr-17-2025 5107.11 $* 5362.90 $*
Mar-17-2025 5062.80 $* 5315.31 $*
Feb-17-2025 5018.6 $* 5269.96 $*
Jan-17-2025 4973.40 $* 5222.90 $*

Характеристики



Product Paramenters




DYE-I-WHISKY BRANDY STILL
Typical Distillation Times
• 1 hour heat up
• 2-2.5 hr stripping run 
• 4 hour distillation time
Structure
 -1 x SS304/red copper still pot 
-1 x Red copper goose neck(helmet) 
-1 x Red copper 4~20plate distillation colum 
-1 x SS304/red copper dephlegmator 
-1 x SS304/red copper condenser 
-1 x SS304 parrot outlet
 -1 x SS304 support for condenser
Structure
High Torque Mash Agitator, CE/UL/CSA/ATEX Explosion Proof. 
Voltage:208/220/230/240/380/415/460/600V, 3Phase, 50/60Hz.
CopperKettle Copper dephlegmator/condenser 
CIP pump and CIP pipe
System at a Glance
Best use: Dedicated Stripping Still, Whiskey, Brandy, Tequila, or Rum Production Acohol content after distillation about 70+-10% 
Versatile and Cost Effective 
Easy Maintenance with Clean in Place 
304 Polished and Brushed Stainless and Polished Copper construction




Recommend Products




Company Profile


DAEYOO TECH.CO.,LTD.WENZHOU
Our company is the leading company of still equipment in China, with the strength of providing vodka, gin, run, whisky, brandy making machines. We have well known master distiller in Canada and the USA, also installation team in North America, and our own researching department and factory, which assure that we can provide high quality distillation equipment for our customers.
Products range from still equipment, brew equipment, bottling system, packing machine etc.












FAQ


Our advantage
DYE company,one of white hair for Brewing and distilling equipment business in China since 1986,wish you good luck and hope you can find suitable product here.


Quality
Quality is the soil of an enterprise. We can offer you competitive advantage products.With us,your money in safe and your business in safe.


Certificate
Our equipment is coming with certifications of PED and our company is TUV approved.We use CE approved components for Europe customers,and CSA or UL approved motor for North American customers.


Do you supply installation equipment in oversea?
Yes, if need, we can also send our installation engineer to your factory to help you do installation and testing,and you need toprovides round-trip ticket and accommodation for our engineer,the extra salary of one installation engineer is USD100.00/day.


How to control quality?
All material we use has material certification.
Before any piece of brewing and distilling equipment leaves DYE. it goes through a complete quality and assurance control inspection. This inspection assures your equipment meets all specifications and is in proper working order before it leaves our facility and arrives at your door.


How can customer know the processes of order?
We will take photo or video during manufacturing every two weeks to make customer clear about the order.when goods is finished,we will take more detailed photos or video for inspect.you can also come to our factory to inspect by yourself.


What is the shipment schedule?
Time is gold for you and for us,so we have professional team work and production line and can make nice quality in short time.We will send you photographs of your order being loaded into the shipping container at the factory.
The shipping container will generally leave port 3-4 days after loading. We will send you a bill of lading and final statement of account within one week of that time. The bill of lading will include the shipping container numbers. You can track your shipping container.Approximately 10 days prior to delivery, we will send you an ETA (Estimated Time of Arrival) notice from the shipping time. Please remember that the listed delivery date is only an estimate, and is subject to port unloading schedules, customs processing, and the dictates of the local delivery truck company.
You will be directly contacted by the shipping company’s local truck delivery services approximately 48 hours prior to the date of delivery to schedule a delivery time.
If you need to delay the final delivery, there will be a “pull” fee of approximately $100, and a storage fee of approximately $150 per shipping container per day.


How can customer visiting our factory?
We are in Wenzhou city,Zhejiang Pr.China.which is very near to Shanghai.From Shanghai,China to our city, it will take 1 hour byair, and 4 hours by fast train.
The name of airport is Wenzhou Longwan International Airport.
The name of fast train station is Wenzhou Nan train station.
And our factory is very close to airport only 15 minutes by car. and 1 hour by car from fast train station.


Qaulity control




Product packaging




Данные ресурс не является интернет-магазином, а лишь содержит ссылки на международную торговую площадку Alibaba.com