Поделиться:
| Месяц | Минимальная цена | Макс. стоимость |
|---|---|---|
| Sep-16-2025 | 0.89 $* | 0.5 $* |
| Aug-16-2025 | 0.12 $* | 0.64 $* |
| Jul-16-2025 | 0.42 $* | 0.11 $* |
| Jun-16-2025 | 0.38 $* | 0.5 $* |
| May-16-2025 | 0.98 $* | 0.36 $* |
| Apr-16-2025 | 0.93 $* | 0.60 $* |
| Mar-16-2025 | 0.81 $* | 0.5 $* |
| Feb-16-2025 | 0.88 $* | 0.36 $* |
| Jan-16-2025 | 0.55 $* | 0.0 $* |


| Product Parameters |
| Conductivity | Lower than that of same length base metal |
| Strength | The joint strength is not less than 95% of low limit of raw material’s strength (CCS material is regarded as pure copper ) |
| Melting point | ≥1 083 ℃ |
| Surface | No air hole ,residue or crack |
| Main Element | Ratio Wt/% |
| Cu | ≥76.0 |
| Al | ≤2.0 |
| Fe | ≤10.0 |
| others | about 10% |
Operation Instruction
l Check to ensure the graphite mold and conductor is clean ,no residue before making the connection
l Use a propane torch to dry wire conductors and remove remaining cleaning residue, solvent, or water before making the connection.
l Close the graphite mold lid before ignition ,and close the lid tightly
l Insert the conductors and position them for the connection.Ensure them in the center of cavity.
l Keep the irrelevant personnel 1.5M away when welding
l Keep the inflammable goods 1-2M away when welding
l The operator must be equipped thermal barrier glove
l Don’t face to the mould opening when welding
l The operator keep 1.5M away mould is must after ignition
l Don’t touch the mould and connected parts directly after welding
l Open the mould and take the joint out with wrench 10-20S later after reaction .
l Insulate the joint after the conductor cooling completely .






| Why Chooes Us |

| Transaction Flow |

| FAQ |
| Question | Answer |
| 1. Are you factory or trader? | We are professional manufacturing factory |
| 2. How to order? | Normally the customer can order our products by Alibaba platform or contact our representative by Email. |
| 3. Do you accept OEM manufacture? | Yes. |
| 4. What's your lead time? | Generally,the lead time is about 20 days after getting your down payment,the real time depends on your |
| 5. what's your payment Term? | Generally, 30% down payment and the remained should be effected before shipping. |
| 6.Where is your nearest port? | Ningbo or shanghai, both of them are about 3 hours ride. |
Данные ресурс не является интернет-магазином, а лишь содержит ссылки на международную торговую площадку Alibaba.com