Поделиться:
Месяц | Минимальная цена | Макс. стоимость |
---|---|---|
Aug-20-2025 | 817.0 $* | 833.18 $* |
Jul-20-2025 | 662.24 $* | 675.32 $* |
Jun-20-2025 | 804.79 $* | 820.73 $* |
May-20-2025 | 797.9 $* | 813.19 $* |
Apr-20-2025 | 637.16 $* | 650.49 $* |
Mar-20-2025 | 784.96 $* | 800.32 $* |
Feb-20-2025 | 778.61 $* | 794.39 $* |
Jan-20-2025 | 772.13 $* | 787.78 $* |
1. Barbed wire is made of high-quality low-carbon steel wire and twisted by fully automatic barbed wire machine. Barbed wire offers a great protection against corrosion and oxidation caused by the atmosphere. Its high resistance allows greater spacing between the fencing posts. Barbed wire is mainly used in protecting of grass boundary, railway, highway, wine, prison, and etc.
2. Material: Electro galvanized wire, hot dipped galvanized wire, stainless steel wire, PVC coated wire in blue, green, yellow and other colors.
Twisted Types: Single Twisted Barbed Wire, Double Twisted Barbed Wire, Traditional Twisted Barbed Wire.
Usage
* Government place
* Factory land
* School playground
* Public buildings
* Car parks
* Business parks and retail premises
* Other places
Raoyang Zerun Metal Wire Mesh Co.,Ltd is a leading China manufacturer and exporter of welded fence,palisade fence,razor wire,military hesco barrier,gabion basket.
1. Registered capital: RMB50,100,000(about USD7,590,000)
2. Area:old factory 30000m²,new factory 36000m²
3. Employees number:288 people
4. Technicist: 8 people,we can design drawing as clients’ requirements
5. No. Of QA inspectors: 5 people
6. Annual turnover: USD15,000,000
7. Certifications: ISO9001:2008
8. Export market: South Africa, Qatar, Iraq, Australia, the united Arab emirates, the United States, Brazil,Turkey,Nigeria,Sudan,Saudi Arabia,Singapore,Philippines,Malaysia,Britain, Russia,Romania,
Turkmenistan, Colombia, Kenya, Zambia, Uganda, Algeria and so on.
Packing offered | Naked or wooden pallet or according to customer requirement. |
Price term and validity | EXW,FOB and CIF price validity for 7 days |
Payment Term | CIF term: T/T, 30% deposit, 70% balance payment against the copy of B/L. FOB term: T/T, 30% deposit, 70% balance payment before shipping. EXW term: 100% T/T, or 30% deposit, 70% payed before loading in container.
|
Production time | About 3-10 days (based on order) after receiving deposit |
Shipment term | By Sea. Special situation is negotiated |
Nearest Port
| Xingang ,Tianjin port |
Samples | Samples are available but you need pay for the sample price and freight fee. |
Q:Are you manufacturer?
A:Yes.We have been in manufacturing this product for 15 years
Q:Where is your factory?
A:No.12 Shuguang East Street, Xicheng Industrial Zone,Raoyang County, Hebei Province, China.
Q:What’s factors in quotation?
A:Wire diameter,Barbed diameter,zinc coating,quantity
Q:How many days the samples will be finished?And how about the mass production?
A:Normally,1-3 days for samples,10-20 days for 3-5 containers.
Q:How many years warranty you can offer?
A: It depends the using environment ,we normally offer 10-15 years warranty.
Q:Do you have technique support on installation?
A:Yes ,we have professional engineer for installation guide service.
Данные ресурс не является интернет-магазином, а лишь содержит ссылки на международную торговую площадку Alibaba.com