Вертикальная печь вертикальная конструкция печи оборудование для производства гидратированного


Поделиться:


Цена:351 800,00 $ - 371 800,00 $*

Количество:



Описание и отзывы


Трекер стоимости

Месяц Минимальная цена Макс. стоимость
Sep-17-2025 418642.93 $* 439574.67 $*
Aug-17-2025 415124.85 $* 435880.91 $*
Jul-17-2025 348282.58 $* 365696.67 $*
Jun-17-2025 408088.37 $* 428492.91 $*
May-17-2025 355318.81 $* 373084.46 $*
Apr-17-2025 401052.7 $* 421105.56 $*
Mar-17-2025 397534.92 $* 417411.48 $*
Feb-17-2025 394016.8 $* 413717.33 $*
Jan-17-2025 390498.42 $* 410023.26 $*

Характеристики


Product Description

Vertical shaft lime kiln is widely used for producing cement for the construction industry. Lime is very important for many other uses and chemical applications, to produce gypsum wallboard or drywall panels, to neutralize toxic chemicals, for air pollution control scrubbing systems, for neutralizing the acidity of soil for agricultural, and Vertical Lime Kilns are used for the production of sugar. Lime is used for pigment in paints.  vertical shaft kilns project is consist of 4 parts, raw materials loading system, calcinating system ,lime discharge system ,and exhaust and dust collecting system vertical shaft kilns project is consist of 4 parts, raw materials loading system, calcinating system ,lime discharge system ,and exhaust and dust collecting system.Limestone and coal are transported to the transition silo on the top of the kiln by belt conveyor with scale , unloading car, and the elevator . The distributor on the top of the kiln will distribute the mixed limestone and coal into the kiln to calcine . The lime calcined will be discharged by the ash discharge , then transported to the finished lime silo by the belt conveyor to storage.In the process of calcination, air is blows into the kiln to combustion by the blower . The air with high temperature will preheat the raw materials , then will be discharged into the air after desulfurization and dust collect system by the draught fan. According to the physical and chemical level of the materials and gases in the kiln, the kiln can be divided into 3 zones at the height of the kiln, namely, preheating zone, calcining zone and cooling zone.The preheating zone is located at the upper part of the kiln, which accounts for about 1/3 of the effective height of the kiln.The material in this region (limestone and coal) temperature by preheating from top-down normal temperature to about 900 DEG C,thus burning gas zone rising (kiln gas decreased from 900) up to 120 DEG C when the material after 900. The water in the material is completely evaporated, CaCo3 in the limestone have been the decomposition, the surface began to decompose, all the material and parts of mineral in coal has been broken down, so the area of the material was drying and preheating.The calcination zone is located in the middle part of the kiln body, which is about 1/6 of the effective height of the kiln body.The temperature in the area of raw materials from top to bottom up to about 1200 DEG C, and then decreased from 1200 DEG C to
about 900 DEG C,the limestone is calcinated into lime, the coal calcinated into ash. In this area, the carbon in anthracite mainly reacts with oxygen in the gas to make the calcium carbonate in the limestone ore decompose and produce the finished lime.The cooling zone is located at the lower part of the kiln, which accounts for about 1/2 of the effective height of the kiln. In this area, the finished lime and cinder fall from about 900 to about 60, while the air in the kiln rises from the normal
temperature to about 900 centigrade. To reduce the material from about 900 DEG C to 60 centigrade, carbon remaining can not burn.the calcium carbonate in limestone residual is no longer decomposition, in the cooling process. While the gas in the kiln rises from normal temperature to about 900 DEG C, the main process of gas is preheated.The preheating zone and the cooling zone are all heat exchange zones, and the gas temperature in the preheating zone is too high,and the heat is transferred to the material with low temperature (limestone, raw coal). The material in the cooling zone (finished products, lime and cinder) is high in temperature and transfers heat to the lower temperature gas (air). This will make the
furnace heat efficiency to a higher level.
Limestone and coal are transported to the transition silo on the top of the kiln by belt conveyor with scale , unloading car, and the elevator . The distributor on the top of the kiln will distribute the mixed limestone and coal into the kiln to calcine . The lime calcined will be discharged by the ash discharge , then transported to the finished lime silo by the belt conveyor to storage.In the process of calcination, air is blows into the kiln to combustion by the blower . The air with high temperature will preheat the raw materials , then will be discharged into the air after desulfurization and dust collect system by the draught fan. According to the physical and chemical level of the materials and gases in the kiln, the kiln can be divided into 3 zones at the height of the kiln, namely, preheating zone, calcining zone and cooling zone.The preheating zone is located at the upper part of the kiln, which accounts for about 1/3 of the effective height of the kiln.The material in this region (limestone and coal) temperature by preheating from top-down normal temperature to about 900 DEG C,thus burning gas zone rising (kiln gas decreased from 900) up to 120 DEG C when the material after 900. The water in the material is completely evaporated, CaCo3 in the limestone have been the decomposition, the surface began to decompose, all the material and parts of mineral in coal has been broken down, so the area of the material was drying and preheating.The calcination zone is located in the middle part of the kiln body, which is about 1/6 of the effective height of the kiln body.
The temperature in the area of raw materials from top to bottom up to about 1200 DEG C, and then decreased from 1200 DEG C to about 900 DEG C,the limestone is calcinated into lime, the coal calcinated into ash. In this area, the carbon in anthracite mainly reacts with oxygen in the gas to make the calcium carbonate in the limestone ore decompose and produce the finished lime.The cooling zone is located at the lower part of the kiln, which accounts for about 1/2 of the effective height of the kiln. In this area, the finished lime and cinder fall from about 900 to about 60, while the air in the kiln rises from the normal temperature to about 900 centigrade. To reduce the material from about 900 DEG C to 60 centigrade, carbon remaining can not burn.the calcium carbonate in limestone residual is no longer decomposition, in the cooling process. While the gas in the kiln rises from normal temperature to about 900 DEG C, the main process of gas is preheated.The preheating zone and the cooling zone are all heat exchange zones, and the gas temperature in the preheating zone is too high,and the heat is transferred to the material with low temperature (limestone, raw coal). The material in the cooling zone (finished
products, lime and cinder) is high in temperature and transfers heat to the lower temperature gas (air). This will make the furnace heat efficiency to a higher level.

The raw lime particles are transported from the quicklime silo to the system, and the design limit is started from the bottom of the storage hopper until the packing system, lime is smaller than 200 meshes. The whole system is equipped with PLC automatic
control and field single equipment control cabinet, the automatic control is divided into three parts, namely the feeding system,the digestion system and the packing system The raw lime particles are transported from the quicklime silo to the system, and the design limit is started from the bottom of
the storage hopper until the packing system, lime is smaller than 200 meshes. The whole system is equipped with PLC automatic control and field single equipment control cabinet, the automatic control is divided into three parts, namely the feeding system,the digestion system and the packing system.Quick lime is transported by belt conveyor from silo into bucket elevator ,then primary hydration machine to slaker by weight conveyor (note: according to capacity, divided into single, double and three axis), then gets into second hydration machine (note:according to capacity, divided into single, double and three axis), then go to third hydration machine , the quality lime will be sent into the silo for packing in the bags each 20-50kgs per bag by the screw conveyor , the bigger size will be milled by Raymond mill .
Quick lime has chemical decomposition and has been decomposed into Ca(OH)2 (CaO+H2O=Ca(OH)2), then transported into separator(mesh can be adjusted). After getting qualified slaked lime and removing impurity. Qualified slaked slime is transported into bucket elevator, then discharged into finished product hopper.According to customer need, it can packed into tank truck or bags. The pollution of whole project is solved by pulse jet dust collector, collecting efficiency is 99.5%, which accords with environmental protection and noise criteria.
Quick lime is transported by belt conveyor from silo into bucket elevator ,then primary hydration machine to slaker by weight conveyor (note: according to capacity, divided into single, double and three axis), then gets into second hydration machine (note:
according to capacity, divided into single, double and three axis), then go to third hydration machine , the quality lime will be sent into the silo for packing in the bags each 20-50kgs per bag by the screw conveyor , the bigger size will be milled by Raymond mill . Quick lime has chemical decomposition and has been decomposed into Ca(OH)2 (CaO+H2O=Ca(OH)2), then transported into separator(mesh
can be adjusted). After getting qualified slaked lime and removing impurity. Qualified slaked slime is transported into bucket elevator, then discharged into finished product hopper.According to customer need, it can packed into tank truck or bags. The pollution of whole project is solved by pulse jet dust
collector, collecting efficiency is 99.5%, which accords with environmental protection and noise criteria


Advantage Of Ours Kiln:

1.Rotate to distribute raw materials evenly,so it can calcining evenly,to improving the quality of finished products.

2.The floor area is small and the sealing is good. It can effectively avoid the exhaust of thermal waste gas without environmental pollution.

3.Rotary discharge, increase stability, to avoid the loss of heat.

4.The temperature and output can be adjusted freely

5.Automatically control the best air distribution and reduce the incomplete combustion loss of fuel.

6.the automation level is high. The adjustment, control and alarm of operation of production system are centralized controlled by PLC in the main control room, with few on-site operators and high labor efficiency.

7.We have 30 years experience in the production of lime production equipment. There are numerous successful cases at home and abroad. The quality is assured and the service is satisfactory.


Working Principle

Large 1,000+ ton/day capacity Vertical Lime Kilns are possible, are very energy efficient and easy to operate. Minimal maintenance is required, because the limestone is brought to the top and into the kiln. Then the limestone is burned (calcined) for a specified time of hours to produce powdered lime. Then the lime is withdrawn at the bottom of the vertical kiln.

The withdrawal at the kiln bottom regulates the gravity flow of limestone and controls the calcining retention time in the kiln. A clinkergrinding mill grinds any remaining chunks of limestone into powder. The lime is then transported by truck trailers or by rail cars. White cement is now very much in demand by the construction industry.


Abroad Installation

The installation quality of the kiln will affect the kiln's working life and the quality of the finished lime. We will dispatch engineers to install on site, including follow-up commissioning and training.

Certifications


Packing And Shipping

The shaft kiln's parts are relatively large and good packaging and shipping are necessary to ensure product transportation safety and reduce freight costs.

Successful Cases

Egypt
Fuel: gas

Kiln size: Inner Dia:φ2.6m height:28m
Capacity: 150TPD/KILN
Raw material:limestone(size:20-40mm CaO:≥52%)
Burnt lime: CaO≥92%
Raw material consumption: 1.7 t limestone/t lime
Fuel consumption: 110m³/t lime
Power consumption: 10KWH/t lime


Serbia
Fuel: coal
Kiln size: Inner Dia:φ2.6m height:21m
Capacity: 150TPD/KILN
Raw material: limestone(size:30-60mm CaO:≥52%)
Burnt lime: CaO≥90%
Raw material consumption: 1.7 t limestone/t lime
Fuel consumption: 1.08t coal/t lime
Power consumption: 10KWH/t lime


Laos
Fuel: coal
Kiln size: Inner Dia:φ3.5m height:28m
Capacity: 230TPD/KILN
Raw material: limestone(size:20-40mm CaO:≥54%)
Burnt lime: CaO≥92%
Raw material consumption: 1.7 t limestone/t lime
Fuel consumption: 1.08t coal/t lime

Power consumption: 10KWH/t lime


Vietnam
Fuel: coal
Kiln size: Inner Dia:φ5.3m height:49m
Capacity: 350TPD/KILN
Raw material: limestone(size:30-60mm CaO:≥54%)
Burnt lime: CaO≥92%
Raw material consumption: 1.7 t limestone/t lime
Fuel consumption: 1.08t coal/t lime
Power consumption: 10KWH/t lime


Pre-sale service

Freely provide project designing, process designing, such as detailed turnkey project technical solutions, draft commercial quotation, processing CAD models etc. And choosing suitable equipment for you.


Medium-sales service

Accompany you to complete the acceptance of the equipment, draft the construction scheme and detailed process, and complete process of export kiln.


After-sales service

We sent engineers to the scene to guide installation, debugging and training.
In addition, we provide warranty to ensure normal operation of your machine,and lifelong technical adviser.


Our Factory

Kaiya Machinery Co.,Ltd is located in Industrial Development Zone, Linyi City, Shandong Province, which main products cover cement production line , lime production line , Stone Crushing & Screening Equipment, and provides customers with comprehensive and one-stop service including site designing guidance, machine installation and debugging, after-sales, supplying spare parts etc. it can provide "turnkey" for customers.

So far, we have established a whole production china of which main equipment: jaw crusher, impact crusher, hammer crusher, cone crusher, rollers crusher, vibrating feeder, vibrating screen and sand-making, sand-washing machinery. We own 8 series products, which more than 100 varieties, serving for mining, metallurgy, chemical, electric power, coal building materials, ceramics, wheel manufacturing, etc, applying in limestone, basalt, shale, dolomite, gypsum, heavy stone, coal and so on.

Kaiya machinery Co.,Ltd takes the quality as the life of the company. Every process is controlled, every machine and the spare parts are inspected, the responsibility to every customer is our quality policy. We will try our best to make the first grade crushers and spare parts for our customers. Reliable quality makes ours products which sold at home and abroad, and obtains the customer's praise. At the same time , our company can supply the standard and non-standard products for ours customers.

Based on the concept of "people-oriented, customer supremacy, development and innovation", we are able to provide our customers not only the highest quality products at the most favorable price, but also the most reasonable solution, such as the selection of equipment, optimum process configuration and a full range of technical support. In pursuit of bringing customers the most benefits with minimal investment, we have been trying our best to help customers at any time!


FAQ

For providing you the suitable quotation we need to know the following information:

1.What is the raw material for the production line?

2.What is the capacity per day or year you required?

3.What will the final product be used for?

4.It is better if you have some report of the raw materials and the fuel.

Once we get your answers, I can provide you the best quotation immediately.

Remarks: The price will depend on different models. Reply message you will get 5% discount price.

What about Warranty of the products?

Kaiya Machinery grants our customers a three-year-period warranty from the date of delivery for machines exported from us. During the warranty period, in case any defect of material or workmanship occurred with spare parts in normal operation, we will at our discretion replace or repair the defective parts freely.

The reason you choose Kaiya Machinery:

1.Professional manufacturer of supplying cement production line, lime production line, stone crushing and screening equipment, 30-year road and bridge experience.

2.To provide customers with on-site design guidance, machine installation and commissioning, after-sales service, spare parts supply and other comprehensive one-stop service, to provide customers with turnkey projects.

3.Experienced professional R & D team and manufacturing team, with a number of exclusive advanced technology.

4.More than 200 customer success cases at home and abroad, you can choose to examine the nearest case.

5.Professional packaging and transportation, save delivery time and transportation costs, ensure product safety and timely delivery around the world.
What about Warranty of the products?
Kaiya Machinery grants our customers a three-year-period warranty from the date of delivery for machines exported from us. During the warranty period, in case any defect of material or workmanship occurred with spare parts in normal operation, we will at our discretion replace or repair the defective parts freely.