Material dealing process:Put the fly ash or sand into the ball mill to mill via the conveyor belt, after milling, put the slurry into the slurry storage tank by slurry pump.
Batching, mixing and pouring process:The lime, cement will convey by conveyor to the dry powder measure scale to scale separately. The slurry convey by slurry pump then to the automatic scale;the power and slurry put into the mixer,pouring into the mould.
Curing process:After slurry pouring into the mould, put the mould box into the curing room with 50~70℃. After 2-3 hours curing,the blocks become solid
Cutting process:Using reversal crane carry the mould and block to demould on cutting cart. The cutting cart will take the block to level cutting machine,vertical cutting ,two sides cutting,and remove the top waste material.
Autoclaved:Finished cutting using semi-product crane carry to the front of autoclave grouped,hoisting machine or dragger will drag steam trolley into autoclave to steam,it need 10-12 hours.
Finished block dealing:Finished product out of autoclave,with separting machine to separate layer by layer.
Package:Using finished block carry hanger clamp the finished product to package line on wooden pallets,after package, then by forklift transport the finished products to piled yard according to specifications to stack.