Поделиться:
Месяц | Минимальная цена | Макс. стоимость |
---|---|---|
Sep-20-2025 | 0.26 $* | 0.37 $* |
Aug-20-2025 | 0.70 $* | 0.86 $* |
Jul-20-2025 | 0.20 $* | 0.56 $* |
Jun-20-2025 | 0.85 $* | 0.55 $* |
May-20-2025 | 0.16 $* | 0.25 $* |
Apr-20-2025 | 0.20 $* | 0.90 $* |
Mar-20-2025 | 0.81 $* | 0.72 $* |
Feb-20-2025 | 0.5 $* | 0.46 $* |
Jan-20-2025 | 0.81 $* | 0.79 $* |
Z94C wire nail making machine
The nail making machine is used for producing various normal nails and special nails.
Available Raw Material for nail making machine:
Normal wire, new metal wire, waste rebar, scrap steel bar, hard-drawn wire, waste electrode, and other kind of waste steel.
Process of nail making:
Wire-Rod → Wires-Drawing → Nail-Making → Polishing → Packing → Delivery
Data of nail making machine:
Item | Model | Length of nail | Diameter of nail | Capacity (pieces/m) | Power |
Nail making machine
| Z94-1C | 9.0-25mm | 0.9-1.6mm | 450 | 1.5kw |
Z94-2C | 16-50mm | 1.2-2.8mm | 300 | 2.2kw | |
Z94-3C | 30-75mm | 1.8-3.1mm | 280 | 3kw | |
Z94-4C | 50-100mm | 2.8-4.5mm | 260 | 4kw | |
Z94-5.5C | 80-150mm | 3.7-5.5mm | 200 | 5.5kw |
Type : Z94-2.8A(50A) | Type : Z94-3A(70A) | Type : Z94-4A(100A) |
Max nail diameter : 2.8mm | Max nail diameter : 3.1mm | Max nail diameter : 4.5mm |
Max nail length : 50mm | Max nail length : 70mm | Max nail length : 100mm |
Output : 350pc/min | Output : 320pc/min | Output : 260pc/min |
Power: 2.2kw | Power: 3kw | Power: 4kw |
Weight: 1000kg | Weight: 1500kg | Weight: 2000kg |
Pictures of nail making machine:
Product picture
Shijiazhuang Soka Import&Export Co.,ltd is a branch of Hebei Jinda Group, mainly import &export business trade service. Jinda group is a multi-industry, a wide range of large private
enterprise,founded in 2003,registered capital of 30 million.
We Specialize in wire drawing machine, annealing machine, tinning machine, nail making machine
and all kindsof accessories. Supply professional service of design and developing, production,
sales and installation and debugging, in every aspect of product implementation of strict quality
control, OEM and ODM service as per customers’ request.
We has strong technical force, senior engineers and technicians team, introduce the lastet technology at home and abroad, by doing better research, to make mechanical machines of good function,
structure, process, and usability, favored by domestic and foreign customers. With professional team, strict management, superior equipment, well received in India, Egypt, Pakistan, Vietnam, Thailand, Uzbekistan etc. With after sales service offices in more than 20 provinces and cities, supply efficient,
quality and considerateservice for you.
01 Q:You product exported to which countries?
We exported to India,Argentina ,Uzbekistan,Tajikistan Russia, Algeria, Thailand,Egypt.,Tanzania,Qatar ,Hungary, Ghana, Turkey, Bangladesh,Trinidad and Tobago,Lithuania
02 Q: If the client no any Production experience, How can help
the client?
A:we provide you with professional team is responsible for equipment installation and debugging
B: training your workers operate the machines,
C: Lifelong provide free technical guidance for our client
D:according to your budget to help you design the ideal investment programs
E: make sure the client with minimum investment and the highest return
03 Q:How about the quality and the service life of the machine ?
Concerning with every detail, every processing procedure of our products, using reliable components. Electrical appliances all adopt international famous brand (Such as Siemens, Schneider )Running test will be carried out before delivery.
The machine at least use 8-20 years, the daily maintenance of equipment and and maintenance is very important ,High configuration equipment use life more longer
04 Q:How long is your machine’s guarantee time?
Whole machine one year, electrical equipment 6 months (except wearing parts)
05 Q.How about the spare parts?
After we finish our deal, we will offer you a spare parts list for your reference.
Make sure we can long-term supply the relevant components of machines and the maintenace service. But after the free period of service, you need to pay some charge according on the actual situation such as travel expense,standard hour plan and the components cost (factory price).
06 Q:How many workers are needed to operate the machine?
1-4 people According to the worker's operation skill level
Данные ресурс не является интернет-магазином, а лишь содержит ссылки на международную торговую площадку Alibaba.com