Поделиться:
Месяц | Минимальная цена | Макс. стоимость |
---|---|---|
Sep-18-2025 | 0.63 $* | 0.45 $* |
Aug-18-2025 | 0.33 $* | 0.57 $* |
Jul-18-2025 | 0.14 $* | 0.48 $* |
Jun-18-2025 | 0.65 $* | 0.3 $* |
May-18-2025 | 0.43 $* | 0.40 $* |
Apr-18-2025 | 0.63 $* | 0.49 $* |
Mar-18-2025 | 0.6 $* | 0.8 $* |
Feb-18-2025 | 0.63 $* | 0.37 $* |
Jan-18-2025 | 0.61 $* | 0.87 $* |
Drywall partition accessories
MAIN DATE
1.Item name: metal stud
2.Raw Materials: hot-dipped galvanized light steel coil, Q195
3.Surface treatment: zinc coat, zinc content:60-140g/sq.m
4.Bottom width: 70mm, flank hight:34.5mm, thickness:0.45mm, length: 3000mm
5.Application: internal building , gypsum board drywall partition
6.Package:10 pcs/bundle G.W: 15.5kg/bundle
FUNCTION AND ADVANTAGE
a. High zinc content, moistureproof, cauterization-resistance
b. Good quality raw materials, high strength, ametabolic
c. Strong bearing capacity, safe firm
d. Beautiful, recyclable material, environmental friendly
SPECIFICATION
Item | spec. (mm) | Thickness (mm) | Length (mm) | package (pcs/bundle) | Weight (kg/bundle) |
stud | 41*22 | 0.3, 0.4, 0.5 | 3000 | 10 | 4.7~6.6 |
48*22 | 0.33, 0.4, 0.5 | 3000 | 10 | 5.55~7.4 | |
40*34.5 | 0.4, 0.45, 0.5 | 3000 | 10 | 10.78~13.47 | |
50*34.5 | 0.4, 0.45, 0.5 | 3000 | 10 | 11.62~14.58 | |
70*34.5 | 0.45, 0.5, 0.6 | 3000 | 10 | 15.40~20.55 | |
75*34.5 | 0.45,0.5, 0.6, 0.7 | 3000 | 10 | 17.66~24.75 | |
100*35 | 0.5, 0.6, 0.7, 0.8 | 3000 | 10 | 20.81~29.36 | |
track | 42*25 | 0.4, 0.45, 0.5 | 3000 | 10 | 8.43~10.54 |
52*25 | 0.4, 0.45, 0.5 | 3000 | 10 | 9.37~11.71 | |
72*25 | 0.45,0.5, 0.6 | 3000 | 10 | 12.65~16.88 | |
75*25 | 0.45, 0.5, 0.6, 0.7 | 3000 | 10 | 13.06~20.42 | |
100*25 | 0.5, 0.6, 0.7, 0.8 | 3000 | 10 | 17.51~23.59 |
METAL STUD AND TRACK INSTALL
1.To fix the ceiling track and the floor track to the clear ceiling and the clear floor with the shoot-nails.
2.Install the metal stud to the ceiling track and the floor track, and use the rivets to fix them in accordance with the design space.
3.The gypsum boards should be installed to the frame with the tapping screw, when the whole frame is formed .
4.One-layer gypsum board is used , the space between two gypsum plaster boards should be staggered. And the double-gypsum board is used the space between two gypsum plaster boards should also be staggered.
5.Joint putty process the final decoration can be done.
Данные ресурс не является интернет-магазином, а лишь содержит ссылки на международную торговую площадку Alibaba.com